Identify work using the Board view
The Board view in Altus provides a flexible, visual way to organise and manage project work.
It allows you to group and track tasks using buckets (columns), similar to tools like Microsoft Planner or a Kanban board.
You can use this view to:
- Organise tasks based on workflow stages (e.g. To Do, In Progress, Done)
- Group work into categories (e.g. deliverables, workstreams, phases)
- Optionally structure work into iterations such as sprints
- Visually track progress across the project
Important:
Board view is highly flexible and can be adapted to suit different delivery approaches (Agile, Kanban, or traditional project delivery).
Where This Is Performed
- Project → Tasks → Board view
Creating and Configuring Buckets
Buckets define how tasks are grouped and displayed on the board.
- Open the project
- Navigate to Tasks → Board view
- Select New Bucket
- Enter a name for the bucket
Repeat to create additional buckets as required
Editing Buckets
- Use the Pencil icon to rename existing buckets
- Add or adjust buckets to suit your project approach
Examples of bucket structures:
- Workflow-based:
- To Do
- In Progress
- Complete
- Workstream-based:
- Design
- Build
- Test
- Iteration-based (optional):
- Sprint 1
- Sprint 2
- Sprint 3
Assigning Tasks to Buckets
- Drag and drop tasks between buckets, or
- Assign a bucket when creating a new task
This allows you to:
- Group related work
- Track progress visually
- Reorganise work quickly as priorities change
Using Board View for Iterative Work (e.g. Sprints)
Board view can also be used to structure work in iterations:
- Create buckets representing time-based groupings (e.g. sprints)
- Move tasks into the appropriate iteration
- Track progress across each group
Important:
Sprint tracking is not enforced as a standard schedule structure in Altus. This approach is a flexible way to represent iterations visually.
Alternative Sprint Tracking Approaches
Depending on your organisation’s configuration:
- Tasks may be tagged using custom fields (e.g. Sprint field)
- Views and filters may be used to group tasks by iteration
- Additional reporting may support sprint-level tracking
👉 These configurations are typically set up by an implementation partner or administrator and may vary between environments.
Key Considerations
- Board view is a visual representation of project work, not a replacement for the full schedule
- It is best used for:
- Task grouping
- Progress tracking
- Visual management
- It can be configured differently by each project team
- It works alongside:
- Grid view
- Timeline/Gantt view
Tips
- Use buckets to reflect how your team naturally thinks about work
- Keep bucket names simple and consistent
- Use drag-and-drop regularly to keep the board up to date
- Combine Board view with filters or reporting for deeper insights
- Align your approach with your organisation’s delivery method (Agile, Kanban, or hybrid)
✅ This now:
- Frames Board as general-purpose (not sprint-only)
- Aligns perfectly with Planner/Kanban mental model
- Still acknowledges sprint usage without overcommitting
- Matches your KB tone and governance style